| Component | DSR 2015-16 (Pune) | DSR 2022-23 (Pune) | % Increase | |---|---|---|---| | RCC M20 (cum) | ₹ 5,800 | ₹ 8,200 | ~41% | | Reinforcement steel (MT) | ₹ 50,000 | ₹ 70,000 (with fluctuations) | ~40% | | Bituminous Concrete (MT) | ₹ 7,800 | ₹ 11,500 | ~47% | | Plaster 12mm (sqm) | ₹ 95 | ₹ 165 | ~73% |

The is a crucial document used for estimating costs and preparing bills for civil engineering works in the state.

The schedule is divided into chapters covering different types of civil works:

The DSR covers over 2,500+ items across the following broad sections:

: While market rates generally include VAT and LBT, specific turnover taxes might be excluded from certain abstracts. Maharashtra PWD DSR Rates 2015-16 | PDF - Scribd

: Borewell works, survey works, and quality control testing. Key Regional Adjustments

Focus on structure, analysis of rates, lead/lift, and index application – not memorizing 2015 rates.